Quality assurance
Quality proven by data, not by claim
Every production program runs against documented process windows, defined inspection methods and measurable capability targets.
- Customer defect rate
- <50 PPM
- On-time delivery
- 99.6%
- Typical Cpk on critical dims
- 1.67
- Lot traceability, resin to ship
- 100%
Customer defect rate
On-time delivery
Typical Cpk on critical dims
Lot traceability, resin to ship
Inspection & metrology
A climate-controlled metrology lab supports first article, in-process and final inspection with calibrated equipment on a documented schedule.
- CMM dimensional layout and FAI reports
- Vision measurement for micro features
- Automated in-line vision sorting
- Gauge R&R and MSA studies
- Material certification retention
- Environmental chamber conditioning

Systems
Documentation your auditors expect
- APQP program planning with phase gates
- PPAP Levels 1 – 5 submissions
- IQ / OQ / PQ validation protocols
- SPC on critical-to-function characteristics
- CAPA and 8D corrective action process
- Change control and revision governance
- Supplier qualification and incoming inspection
- Annual internal and third-party audits
Need a capability study or PPAP package reviewed?
Send your quality requirements with your RFQ and we will return a documented plan alongside pricing.